June 11-15, 2012: Reported FERC Issuances
| Date Posted: June 18, 2012 |
The following documents have been issued by the Federal Energy Regulatory Commission (FERC) during the week of June 11-15, 2012, and designated for inclusion in the official FERC Reporter. The issuances are listed in the following order: Rulemakings, Natural Gas Orders, Electric Orders and Hydro Orders.
Capacity Deliverability Across the Midwest Independent Transmission System Operator Inc./PJM Interconnection L.L.C. Seam, Docket No. AD12-16-000 “Notice of Request for Comments” (June 11, 2012); 139 FERC ¶61,200 (2012).
http://elibrary.ferc.gov/idmws/file_list.asp?document_id=14029366
FERC “seeks comments regarding whether existing rules on transfer capability act as barriers to the delivery of generation capacity between the markets administered by Midwest Independent System Operator Inc. ... and PJM Interconnection L.L.C., ... and to the extent that such barriers exist, whether those rules should be modified to mitigate such barriers.”
Transmission Loading Relief Reliability Standard and Curtailment Priorities, Docket No. RM10-9-000 “Order Terminating Proceeding” (June 14, 2012); 139 FERC ¶61,218 (2012).
http://elibrary.ferc.gov/idmws/file_list.asp?document_id=14030634
On Jan. 21, 2010, FERC issued a Notice of Inquiry seeking comments regarding whether there are conflicts between the North American Electric Reliability Corp. (NERC) Reliability Standard IRO-006-04 (Reliability Coordination – Transmission Loading Relief ) and the curtailment priorities set forth in FERC’s pro forma Open Access Transmission Tariff (OATT). FERC found “that the requirements of Reliability Standard IRO-006-04 have not been shown to be in conflict with the curtailment priorities of the pro forma OATT. Therefore, the Commission terminates the Notice of Inquiry.”
USG Pipeline Co. LLC, Docket Nos. TS12-2-000 and RP12-300-000 “Order Granting in Part, and Denying in Part, Petition for Waivers, Subject to Conditions” (June 11, 2012); 139 FERC ¶61,202 (2012).
http://elibrary.ferc.gov/idmws/file_list.asp?document_id=14029541
Equitrans L.P., Docket No. CP12-32-000 “Order Amending Certificate, Authorizing Abandonment, and Approving Lease” (June 12, 2012); 139 FERC ¶61,205 (2012).
http://elibrary.ferc.gov/idmws/file_list.asp?document_id=14029705
Enbridge Pipelines (North Texas) L.P., Docket No. PR09-26-000 “Order on Revisions to Statement of Operating Conditions” (June 13, 2012); 139 FERC ¶61,216 (2012).
http://elibrary.ferc.gov/idmws/file_list.asp?document_id=14030133
Leaf River Energy Center LLC, Docket No. CP12-91-000 “Order Amending Certificate” (June 13, 2012) (Dir. McGehee); 139 FERC ¶62,221 (2012).
http://elibrary.ferc.gov/idmws/file_list.asp?document_id=14030142
Iroquois Gas Transmission System L.P., Docket No. RP12-295-000 “Order Accepting Tariff Records Subject to Conditions” (June 14, 2012); 139 FERC ¶61,217 (2012).
http://elibrary.ferc.gov/idmws/file_list.asp?document_id=14030585
Kern River Gas Transmission Co., Docket No. RP12-250-000 “Order on Compliance Filing” (June 15, 2012); 139 FERC ¶61,221 (2012).
http://elibrary.ferc.gov/idmws/file_list.asp?document_id=14030856
Midwest Independent Transmission System Operator Inc., Docket No. ER11-4081-000 “Order on Resource Adequacy Proposal” (June 11, 2012); 139 FERC ¶61,199 (2012).
http://elibrary.ferc.gov/idmws/file_list.asp?document_id=14029363
Erie Wind LLC, Docket No. EC12-98-000 “Order Authorizing Disposition of Jurisdictional Facilities” (June 11, 2012) (Dir. Rodgers); 139 FERC ¶62,203 (2012).
http://elibrary.ferc.gov/idmws/file_list.asp?document_id=14029431
Alpha Gas & Electric LLC, Docket No. EC12-100-000 “Order Authorizing the Disposition of Facilities” (June 11, 2012) (Dir. Rodgers); 139 FERC ¶62,204 (2012).
http://elibrary.ferc.gov/idmws/file_list.asp?document_id=14029433
DeWind Novus LLC and DeWind Novus II LLC, Docket Nos. QF11-235-001 and QF12-99-001 “Order Granting Applications for Commission Certification” (June 11, 2012); 139 FERC ¶61,201 (2012).
http://elibrary.ferc.gov/idmws/file_list.asp?document_id=14029567
San Diego Gas & Electric Co. v. Sellers of Energy and Ancillary Services, et al., Docket No. EL00-95-000, et al. “Order Granting Motion to Opt Into Settlement Agreement Out of Time” (June 11, 2012); 139 FERC ¶61,204 (2012).
http://elibrary.ferc.gov/idmws/file_list.asp?document_id=14029570
California Independent System Operator Corp., Docket No. ER06-615-000, et al. “Order Granting Motion for Extension of Time and Waiver Request” (June 12, 2012); 139 FERC ¶61,206 (2012).
http://elibrary.ferc.gov/idmws/file_list.asp?document_id=14029799
Puget Sound Energy Inc. v. All Jurisdictional Sellers of Energy ..., Docket No. EL01-10-083 “Certification of Uncontested Settlement” (June 12, 2012) (J. Dring); 139 FERC ¶63,016 (2012).
http://elibrary.ferc.gov/idmws/file_list.asp?document_id=14029851
Puget Sound Energy Inc. v. All Jurisdictional Sellers of Energy ..., Docket No. EL01-10-082 “Certification of Uncontested Settlement” (June 12, 2012) (J. Dring); 139 FERC ¶63,017 (2012).
http://elibrary.ferc.gov/idmws/file_list.asp?document_id=14029852
Puget Sound Energy Inc. v. All Jurisdictional Sellers of Energy ..., Docket No. EL01-10-088 “Certification of Uncontested Settlement” (June 12, 2012) (J. Dring); 139 FERC ¶63,018 (2012).
http://elibrary.ferc.gov/idmws/file_list.asp?document_id=14029853
Avenal Park LLC, et al., Docket No. EC12-97-000 “Order Authorizing Disposition of Jurisdictional Facilities” (June 12, 2012) (Dir. Rodgers); 139 FERC ¶62,205 (2012).
http://elibrary.ferc.gov/idmws/file_list.asp?document_id=14029869
Lowell Cogeneration Co. Limited Partnership and Power City Partners L.P., Docket No. EC12-99-000 “Order Authorizing Disposition of Jurisdictional Facilities” (June 12, 2012) (Dir. Rodgers); 139 FERC ¶62,206 (2012).
http://elibrary.ferc.gov/idmws/file_list.asp?document_id=14029870
California Independent System Operator Corp., Docket No. ER12-205-000 “Order Granting Petition for Waiver of Tariff Provisions” (June 13, 2012); 139 FERC ¶61,207 (2012).
http://elibrary.ferc.gov/idmws/file_list.asp?document_id=14030128
MATL LLP and Montana Alberta Tie Ltd., Docket No. EL12-26-000 “Order on Petition for Declaratory Order” (June 13, 2012); 139 FERC ¶61,208 (2012).
http://elibrary.ferc.gov/idmws/file_list.asp?document_id=14030078
City of Tacoma, Docket No. EL01-10-078 “Letter Order Approving Filing of Amended Offer of Settlement” (June 13, 2012); 139 FERC ¶61,209 (2012).
http://elibrary.ferc.gov/idmws/file_list.asp?document_id=14030061
California v. Powerex Corp., et al., Docket No. EL09-56-013 “Order Denying Rehearing” (June 13, 2012); 139 FERC ¶61,210 (2012).
http://elibrary.ferc.gov/idmws/file_list.asp?document_id=14030264
California v. British Columbia Power Exchange Corp., et al., Docket No. EL02-71-036 “Order Denying Rehearing” (June 13, 2012); 139 FERC ¶61,211 (2012).
http://elibrary.ferc.gov/idmws/file_list.asp?document_id=14030266
San Diego Gas & Electric Co. v. Sellers of Energy and Ancillary Services, et al., Docket No. EL00-95-263, et al. “Order Denying Clarification and Rehearing” (June 13, 2012); 139 FERC ¶61,212 (2012).
http://elibrary.ferc.gov/idmws/file_list.asp?document_id=14030267
California v. British Columbia Power Exchange Corp., et al., Docket Nos. EL02-71-000 and EL09-56-000 “Order Denying Motion of Mieco Inc. for Attorneys’ and Consultants’ Fees” (June 13, 2012); 139 FERC ¶61,213 (2012).
http://elibrary.ferc.gov/idmws/file_list.asp?document_id=14030268
Cedar Creek Wind Energy LLC and Milford Wind Corridor Phase I LLC, Docket Nos. RC11-1-002 and RC11-2-002 “Order Accepting Compliance Filing” (June 13, 2012); 139 FERC ¶61,214 (2012).
http://elibrary.ferc.gov/idmws/file_list.asp?document_id=14030086
Detroit Edison Co., Docket No. ES12-37-000 “Letter Order Authorizing Issuance of Secured and Unsecured Long-Term Debt Securities” (June 13, 2012) (Dir. Rodgers); 139 FERC ¶62,219 (2012).
http://elibrary.ferc.gov/idmws/file_list.asp?document_id=14030073
PHI Service Co., Docket No. ES12-38-000 “Letter Order Granting Filing of Interest Rate Short-Term Debt Securities” (June 13, 2012) (Dir. Rodgers); 139 FERC ¶62,220 (2012).
http://elibrary.ferc.gov/idmws/file_list.asp?document_id=14030077
Nevada Power Co., Docket No. ER11-4215-000 “Certificate of Uncontested Settlement” (June 13, 2012) (J. Cianci); 139 FERC ¶63,019 (2012).
http://elibrary.ferc.gov/idmws/file_list.asp?document_id=14030203
System Energy Resources Inc., Docket No. ES11-30-002 “Letter Order Authorizing Issuance of Long-Term Debt” (June 14, 2012) (Dir. Rodgers); 139 FERC ¶62,231 (2012).
http://elibrary.ferc.gov/idmws/file_list.asp?document_id=14030502
System Energy Resources Inc., Docket No. ES12-39-000 “Letter Order Accepting Application Requesting Extension of Expiration Date of Letter of Credit and Reimbursement Agreements” (June 14, 2012) (Dir. Rodgers); 139 FERC ¶62,232 (2012).
http://elibrary.ferc.gov/idmws/file_list.asp?document_id=14030511
Midwest Independent Transmission System Operator Inc., Docket Nos. ER06-192-000, ER06-192-001 and ER06-192-002 “Order Accepting in Part and Rejecting in Part Tariff Sheets Submitted in Compliance with Order Nos. 2006, 2006-A and 2006-B” (June 15, 2012); 139 FERC ¶61,219 (2012).
http://elibrary.ferc.gov/idmws/file_list.asp?document_id=14030748
High Majestic Interconnection Services LLC and High Majestic Wind Energy Center LLC, Docket Nos. ER12-1555-000, ER12-1556-000 and ER12-1559-001 “Order Accepting Agreements and Granting Request for Waivers” (June 15, 2012); 139 FERC ¶61,220 (2012).
http://elibrary.ferc.gov/idmws/file_list.asp?document_id=14030831
Riverside Energy Center LLC and Wisconsin Power and Light Co., Docket No. EC12-102-000 “Order Authorizing Acquisition and Disposition of Jurisdictional Facilities” (June 15, 2012) (Dir. Rodgers); 139 FERC ¶62,233 (2012).
http://elibrary.ferc.gov/idmws/file_list.asp?document_id=14030763
Golden Spread Electric Cooperative Inc., et al., Docket No. EC12-101-000 “Order Authorizing Disposition of Jurisdictional Facilities” (June 15, 2012) (Dir. Rodgers); 139 FERC ¶62,238 (2012).
http://elibrary.ferc.gov/idmws/file_list.asp?document_id=14030782
FFP Project 108 LLC, Project No. 14365-000 “Order Issuing Preliminary Permit and Granting Priority to File License Application” (June 11, 2012) (Chief Smith); 139 FERC ¶62,202 (2012).
http://elibrary.ferc.gov/idmws/file_list.asp?document_id=14029426
TideWorks LLC, Project No. 13656-002 “Order Denying Request for Rehearing” (June 11, 2012); 139 FERC ¶61,203 (2012).
http://elibrary.ferc.gov/idmws/file_list.asp?document_id=14029554
Appalachian Power Co., Project No. 739-029 “Order Modifying and Approving Revised Water Quality Monitoring Plan” (June 12, 2012) (Chief LoVullo); 139 FERC ¶62,207 (2012).
http://elibrary.ferc.gov/idmws/file_list.asp?document_id=14029872
Appalachian Power Co., Project No. 739-030 “Order Modifying and Approving Revised Freshwater Mussel Adaptive Monitoring Plan” (June 12, 2012) (Chief LoVullo); 139 FERC ¶62,208 (2012).
http://elibrary.ferc.gov/idmws/file_list.asp?document_id=14029873
Grand River Dam Authority, Project No. 1494-397 “Order Amending Approved Non-Project Use of Project Lands and Waters” (June 12, 2012) (Chief Fletcher); 139 FERC ¶62,209 (2012).
http://elibrary.ferc.gov/idmws/file_list.asp?document_id=14029875
Virginia Electric and Power Co., Project No. 2009-151 “Order Granting Extension of Time Under Article 401” (June 12, 2012) (Chief LoVullo); 139 FERC ¶62,210 (2012).
http://elibrary.ferc.gov/idmws/file_list.asp?document_id=14029877
Portland General Electric Co., Project No. 2195-049 “Order Approving Schedule for Development of Plans for Downstream Fish Passage Studies Under Appendices A, D, and E” (June 12, 2012) (Chief Hocking); 139 FERC ¶62,211 (2012).
http://elibrary.ferc.gov/idmws/file_list.asp?document_id=14029881
Portland General Electric Co., Project No. 2195-074 “Order Modifying and Approving Upstream Fish Passage Effectiveness Monitoring Plan Under Articles 34 of Appendices D and E” (June 12, 2012) (Chief LoVullo); 139 FERC ¶62,212 (2012).
http://elibrary.ferc.gov/idmws/file_list.asp?document_id=14029890
Portland General Electric Co., Project No. 2195-076 “Order Modifying and Approving Hatchery Spring Chinook Smolt Stocking Plan Under Article 403” (June 12, 2012) (Chief LoVullo); 139 FERC ¶62,213 (2012).
http://elibrary.ferc.gov/idmws/file_list.asp?document_id=14029891
Wisconsin Public Service Corp., Project No. 2525-074, et al. “Order Modifying and Approving Updated Comprehensive Land and Wildlife Management Plan” (June 12, 2012) (Chief Fletcher); 139 FERC ¶62,214 (2012).
http://elibrary.ferc.gov/idmws/file_list.asp?document_id=14029893
Erie Boulevard Hydropower L.P., Project No. 7387-065 “Order Approving Trashrack Replacement Plan” (June 12, 2012) (Team Lead Fayyad); 139 FERC ¶62,215 (2012).
http://elibrary.ferc.gov/idmws/file_list.asp?document_id=14029898
Granite County, Mont., Project No. 12107-011 “Order Approving Financing Plan Pursuant to Article 306” (June 12, 2012) (Chief Guey-Lee); 139 FERC ¶62,216 (2012).
http://elibrary.ferc.gov/idmws/file_list.asp?document_id=14029899
Dorena Lake Hydro LLC, Project No. 11945-026 “Order Approving Financing Plan Pursuant to Article 304” (June 12, 2012) (Team Lead Fayyad); 139 FERC ¶62,217 (2012).
http://elibrary.ferc.gov/idmws/file_list.asp?document_id=14029900
Francis Walter Hydro LLC, Project No. 14314-000 “Order Issuing Preliminary Permit and Granting Priority to File License Application” (June 12, 2012) (Chief Smith); 139 FERC ¶62,218 (2012).
http://elibrary.ferc.gov/idmws/file_list.asp?document_id=14029902
FPL Energy Maine Hydro LLC, Project No. 2612-020 “Order Amending License and Lifting Stay” (June 13, 2012); 139 FERC ¶61,215 (2012).
http://elibrary.ferc.gov/idmws/file_list.asp?document_id=14030179
Northern States Power Co., Project No. 2056-049 “Order Approving As-Built Exhibit R Drawings” (June 13, 2012) (Chief Cover); 139 FERC ¶62,222 (2012).
http://elibrary.ferc.gov/idmws/file_list.asp?document_id=14030208
Public Utility District No. 2 of Grant County, Project No. 2114-253 “Order Approving As-Built Exhibits Under Article 418” (June 13, 2012) (Chief Cover); 139 FERC ¶62,223 (2012).
http://elibrary.ferc.gov/idmws/file_list.asp?document_id=14030215
Duke Energy Indiana Inc., Project No. 2211-004 “Order Approving Exhibit G Drawings and Revising Annual Charges” (June 13, 2012) (Chief Cover); 139 FERC ¶62,224 (2012).
http://elibrary.ferc.gov/idmws/file_list.asp?document_id=14030219
Entergy Arkansas Inc., Project No. 271-117 “Order Amending Non-Project Use of Project Lands and Waters” (June 14, 2012) (Chief Fletcher); 139 FERC ¶62,225 (2012).
http://elibrary.ferc.gov/idmws/file_list.asp?document_id=14030458
Public Utility District No. 1 of Chelan County, Wash., Project No. 2145-102 “Order Modifying and Approving Entiatqua Trail Implementation Plan” (June 14, 2012) (Chief Fletcher); 139 FERC ¶62,226 (2012).
http://elibrary.ferc.gov/idmws/file_list.asp?document_id=14030474
Portland General Electric Co., Project No. 2195-050 “Order Modifying and Approving Lower Oak Grove Fork Biological Monitoring Plan Under Appendix B” (June 14, 2012) (Chief Hocking); 139 FERC ¶62,227 (2012).
http://elibrary.ferc.gov/idmws/file_list.asp?document_id=14030475
City of Kaukauna, Wis., Project No. 2677-032 “Order Approving Large Woody Debris Passage Plan Pursuant to Article 401” (June 14, 2012) (Chief Hocking); 139 FERC ¶62,228 (2012).
http://elibrary.ferc.gov/idmws/file_list.asp?document_id=14030476
Deschutes Valley Water District, Project No. 5891-008 “Order Modifying and Approving Temporary Modification of Instream Flow Releases Under Article 36” (June 14, 2012) (Chief LoVullo); 139 FERC ¶62,229 (2012).
http://elibrary.ferc.gov/idmws/file_list.asp?document_id=14030478
Public Service Co. of New Hampshire, Project No. 7528-021 “Order Approving Revised Exhibit G Drawing” (June 14, 2012) (Chief Cover); 139 FERC ¶62,230 (2012).
http://elibrary.ferc.gov/idmws/file_list.asp?document_id=14030479
Pacific Gas and Electric Co., Project No. 2107-020 “Order Certifying Incremental Hydropower Generation for Production Tax Credit” (June 15, 2012) (Team Lead Fayyad); 139 FERC ¶62,234 (2012).
http://elibrary.ferc.gov/idmws/file_list.asp?document_id=14030767
Pacific Gas and Electric Co., Project No. 1962-194 “Order Certifying Incremental Hydropower Generation for Production Tax Credit” (June 15, 2012) (Team Lead Fayyad); 139 FERC ¶62,235 (2012).
http://elibrary.ferc.gov/idmws/file_list.asp?document_id=14030774
Grant County Public Utilities District No. 2, Project No. 2114-150, et al. “Order Modifying Filing Requirements Under License Articles 401(A)(1), 401(A)(2), 401(A)(3), 401(A)(4), 401(A)(8) and 404” (June 15, 2012) (Chief LoVullo); 139 FERC ¶62,236 (2012).
http://elibrary.ferc.gov/idmws/file_list.asp?document_id=14030775
City of Crystal Falls, Project No. 11402-073 “Order Approving Temporary Variance and Granting Extension of Time” (June 15, 2012) (Chief Hocking); 139 FERC ¶62,237 (2012).
http://elibrary.ferc.gov/idmws/file_list.asp?document_id=14030777
City of New York, Project No. 14366-000 “Order Issuing Successive Preliminary Permit and Granting Priority to File License Application” (June 15, 2012) (Chief Smith); 139 FERC ¶62,239 (2012).
http://elibrary.ferc.gov/idmws/file_list.asp?document_id=14030784
For complete coverage of FERC's procedural rules and policies, see the FERC Practice and Procedure Manual.
For an explanation of FERC's natural gas regulations and policies, see the Natural Gas Transportation Information Service.
Related Publications
![]() |
||||||||||
|
||||||||||
![]() |
||||||||||
FERC Practice and Procedure Manual
Natural Gas Transportation Information Service